The challenge
The channel had to remain navigable for yachts with a 22-metre air draft, the marine environment is highly corrosive, and the bridge would be the landmark of the whole development.
Infrastructure · 2026
A 480-metre cable-stayed crossing linking two marina districts across a tidal channel.
01
The channel had to remain navigable for yachts with a 22-metre air draft, the marine environment is highly corrosive, and the bridge would be the landmark of the whole development.
02
A single inclined pylon supports a slender composite deck with a 240-metre main span. Durability was designed in from the start: high-performance concrete with a 100-year service life, stainless reinforcement in the splash zone, and fully replaceable stay cables.
03
Currently under construction, with the pylon topped out in July 2026 and completion scheduled for the second quarter of 2027.